01

Start with the application

Share the required capacity, primary and secondary voltages, installation location, and target delivery date. Loading conditions, ambient temperature, and the type of equipment being powered help define the configuration.

02

Review the design before production

After an order is placed, Supertran issues approval drawings for review. Production begins after formal design approval. Confirm the technical scope, commercial terms, and delivery requirements before committing.

03

Verify before shipment

Factory acceptance testing and test documentation help verify equipment against the approved specification. Independent witnessing and pre-shipment inspection are available for Supertran equipment and third-party manufacturers.

04

Plan for the site

Delivery is only one part of the project. Coordinate assembly, oil processing, acceptance testing, and commissioning with the site team. Supertran can provide technical oversight or direct field support.